RTE I90 over Canadaway Creek
FairChautauqua County, New York · 2.9 MI W of Dunkirk Int · Structure no. 000000005511322
- Built
- 1957
- 68 years old
- Condition
- Fair
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 80 ft
- 1 main span
- Daily traffic
- 8,444
- 2020 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
RTE I90 over Canadaway Creek is a steel stringer/multi-beam or girder carrying RTE I90 over Canadaway Creek in Chautauqua County, New York. It was built in 1957, so it is 68 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,444 vehicles a day, roughly 49% of them trucks, projected to reach 9,463 by 2041. The structure is 80 ft (24.4 m) long and 56 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE I90 over Canadaway Creek built?
It was built in 1957, making it 68 years old in 2025.
What condition is RTE I90 over Canadaway Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does RTE I90 over Canadaway Creek carry?
About 8,444 vehicles per day (2020 count), of which roughly 49% are trucks.
How long is RTE I90 over Canadaway Creek?
The structure is 80 ft (24.4 m) long with a longest span of 77 ft (23.5 m) and a deck 56 ft wide.
Who owns RTE I90 over Canadaway Creek?
It is owned by the State Toll Authority.