US Bridges

RTE I87 over Relief

Good

Bronx County, New York · 1.5 MI S JCT I87 & I95 · Structure no. 00000000106680A

Built
1956
69 years old, rebuilt 2018
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
198 ft
4 main spans
Daily traffic
6,291
2020 count
Owner
State
State Highway Agency

About this bridge

RTE I87 over Relief is a steel continuous stringer/multi-beam or girder carrying RTE I87 over Relief in Bronx County, New York. It was built in 1956 and reconstructed in 2018, so it is 69 years old, older than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,291 vehicles a day, roughly 8% of them trucks, projected to reach 8,038 by 2041. The structure is 198 ft (60.4 m) long and 29 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesRTE I87
CrossesRelief
Location1.5 MI S JCT I87 & I95
RouteInterstate 87
Coordinates40.81762, -73.93068
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating52 US tons
Inventory rating30 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length198 ft (60.4 m)
Longest span52 ft (15.8 m)
Deck width29 ft (8.8 m)
Roadway width25 ft (7.6 m)
Vertical clearance over deck18 ft (5.4 m)

Traffic and service

Average daily traffic6,291 (2020)
Projected traffic8,038 by 2041
Trucks8%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$4.8 million (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was RTE I87 over Relief built?

It was built in 1956, making it 69 years old in 2025. It was reconstructed in 2018.

What condition is RTE I87 over Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does RTE I87 over Relief carry?

About 6,291 vehicles per day (2020 count), of which roughly 8% are trucks.

How long is RTE I87 over Relief?

The structure is 198 ft (60.4 m) long with a longest span of 52 ft (15.8 m) and a deck 29 ft wide.

Who owns RTE I87 over Relief?

It is owned by the State Highway Agency.