US Bridges

RTE 910 over Fuller Road Roundabout

Good

Albany County, New York · Washington Ave. Ext. over · Structure no. 000000001079440

Built
2012
13 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
99 ft
1 main span
Daily traffic
22,600
2020 count
Owner
State
State Highway Agency

About this bridge

RTE 910 over Fuller Road Roundabout is a steel stringer/multi-beam or girder carrying RTE 910 over Fuller Road Roundabout in Albany County, New York. It was built in 2012, so it is 13 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 22,600 vehicles a day, roughly 5% of them trucks, projected to reach 26,188 by 2041. The structure is 99 ft (30.2 m) long and 72 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesRTE 910
CrossesFuller Road Roundabout
LocationWashington Ave. Ext. over
RouteCity Street 910
Coordinates42.69331, -73.83087
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating95 US tons
Inventory rating57 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length99 ft (30.2 m)
Longest span95 ft (29 m)
Deck width72 ft (21.9 m)
Roadway width67 ft (20.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic22,600 (2020)
Projected traffic26,188 by 2041
Trucks5%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$3 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was RTE 910 over Fuller Road Roundabout built?

It was built in 2012, making it 13 years old in 2025.

What condition is RTE 910 over Fuller Road Roundabout in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does RTE 910 over Fuller Road Roundabout carry?

About 22,600 vehicles per day (2020 count), of which roughly 5% are trucks.

How long is RTE 910 over Fuller Road Roundabout?

The structure is 99 ft (30.2 m) long with a longest span of 95 ft (29 m) and a deck 72 ft wide.

Who owns RTE 910 over Fuller Road Roundabout?

It is owned by the State Highway Agency.