RTE I90 over Fuller Road
GoodAlbany County, New York · JCT of I90 & Fuller RD · Structure no. 000000001034479
- Built
- 1968
- 57 years old, rebuilt 2021
- Condition
- Good
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 133 ft
- 3 main spans
- Daily traffic
- 87,330
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
RTE I90 over Fuller Road is a steel stringer/multi-beam or girder carrying RTE I90 over Fuller Road in Albany County, New York. It was built in 1968 and reconstructed in 2021, so it is 57 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 87,330 vehicles a day, roughly 5% of them trucks, projected to reach 138,391 by 2041. The structure is 133 ft (40.5 m) long and 122 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE I90 over Fuller Road built?
It was built in 1968, making it 57 years old in 2025. It was reconstructed in 2021.
What condition is RTE I90 over Fuller Road in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does RTE I90 over Fuller Road carry?
About 87,330 vehicles per day (2019 count), of which roughly 5% are trucks.
How long is RTE I90 over Fuller Road?
The structure is 133 ft (40.5 m) long with a longest span of 62 ft (18.8 m) and a deck 122 ft wide.
Who owns RTE I90 over Fuller Road?
It is owned by the State Highway Agency.