US Bridges

Summerlin Pw over Town Center DR

Good

Clark County, Nevada · Summerlin · Structure no. I2533E

Built
1999
26 years old
Condition
Good
inspected February 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
195 ft
2 main spans
Daily traffic
7,675
2017 count
Owner
City
City or Municipal Highway Agency

About this bridge

Summerlin Pw over Town Center DR is a prestressed concrete continuous box beam or girders - multiple carrying Summerlin Pw over Town Center DR in Clark County, Nevada. It was built in 1999, so it is 26 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,675 vehicles a day, roughly 3% of them trucks, projected to reach 26,000 by 2040. The structure is 195 ft (59.4 m) long and 41 ft wide.

CarriesSummerlin Pw
CrossesTown Center DR
LocationSummerlin
RouteCity Street 0
StateNevada
Coordinates36.18687, -115.30672
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating74.5 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length195 ft (59.4 m)
Longest span97 ft (29.6 m)
Deck width41 ft (12.5 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,675 (2017)
Projected traffic26,000 by 2040
Trucks3%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Summerlin Pw over Town Center DR built?

It was built in 1999, making it 26 years old in 2025.

What condition is Summerlin Pw over Town Center DR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Summerlin Pw over Town Center DR carry?

About 7,675 vehicles per day (2017 count), of which roughly 3% are trucks.

How long is Summerlin Pw over Town Center DR?

The structure is 195 ft (59.4 m) long with a longest span of 97 ft (29.6 m) and a deck 41 ft wide.

Who owns Summerlin Pw over Town Center DR?

It is owned by the City or Municipal Highway Agency.