Summerlin Pw over Town Center DR
GoodClark County, Nevada · Summerlin · Structure no. I2533E
- Built
- 1999
- 26 years old
- Condition
- Good
- inspected February 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 195 ft
- 2 main spans
- Daily traffic
- 7,675
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Summerlin Pw over Town Center DR is a prestressed concrete continuous box beam or girders - multiple carrying Summerlin Pw over Town Center DR in Clark County, Nevada. It was built in 1999, so it is 26 years old, younger than the Nevada average of 36.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 7,675 vehicles a day, roughly 3% of them trucks, projected to reach 26,000 by 2040. The structure is 195 ft (59.4 m) long and 41 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Summerlin Pw over Town Center DR built?
It was built in 1999, making it 26 years old in 2025.
What condition is Summerlin Pw over Town Center DR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does Summerlin Pw over Town Center DR carry?
About 7,675 vehicles per day (2017 count), of which roughly 3% are trucks.
How long is Summerlin Pw over Town Center DR?
The structure is 195 ft (59.4 m) long with a longest span of 97 ft (29.6 m) and a deck 41 ft wide.
Who owns Summerlin Pw over Town Center DR?
It is owned by the City or Municipal Highway Agency.