Crestdale LN over Channel
FairClark County, Nevada · Summerlin · Structure no. B2542
- Built
- 1999
- 26 years old
- Condition
- Fair
- inspected January 2024
- Type
- Culvert
- Concrete
- Length
- 28 ft
- 3 main spans
- Daily traffic
- 2,300
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Crestdale LN over Channel is a concrete culvert carrying Crestdale LN over Channel in Clark County, Nevada. It was built in 1999, so it is 26 years old, younger than the Nevada average of 36.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,300 vehicles a day, projected to reach 4,757 by 2040. The structure is 28 ft (8.4 m) long.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 8 Very Good | No problems noted. |
| Culvert | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Crestdale LN over Channel built?
It was built in 1999, making it 26 years old in 2025.
What condition is Crestdale LN over Channel in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does Crestdale LN over Channel carry?
About 2,300 vehicles per day (2017 count).
How long is Crestdale LN over Channel?
The structure is 28 ft (8.4 m) long with a longest span of 9 ft (2.7 m).
Who owns Crestdale LN over Channel?
It is owned by the City or Municipal Highway Agency.