US Bridges

US95 NW1 Ramp over Mlk Blvd

Good

Clark County, Nevada · Neon · Structure no. H3224R

Built
2017
8 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
159 ft
1 main span
Daily traffic
46,000
2017 count
Owner
State
State Highway Agency

About this bridge

US95 NW1 Ramp over Mlk Blvd is a prestressed concrete stringer/multi-beam or girder carrying US95 NW1 Ramp over Mlk Blvd in Clark County, Nevada. It was built in 2017, so it is 8 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 46,000 vehicles a day, roughly 3% of them trucks, projected to reach 95,133 by 2040. The structure is 159 ft (48.4 m) long and 39 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesUS95 NW1 Ramp
CrossesMlk Blvd
LocationNeon
RouteU.S. Route 95
StateNevada
Coordinates36.1755, -115.16086
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.6 US tons
Inventory rating47.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length159 ft (48.4 m)
Longest span157 ft (47.8 m)
Deck width39 ft (11.9 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic46,000 (2017)
Projected traffic95,133 by 2040
Trucks3%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US95 NW1 Ramp over Mlk Blvd built?

It was built in 2017, making it 8 years old in 2025.

What condition is US95 NW1 Ramp over Mlk Blvd in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does US95 NW1 Ramp over Mlk Blvd carry?

About 46,000 vehicles per day (2017 count), of which roughly 3% are trucks.

How long is US95 NW1 Ramp over Mlk Blvd?

The structure is 159 ft (48.4 m) long with a longest span of 157 ft (47.8 m) and a deck 39 ft wide.

Who owns US95 NW1 Ramp over Mlk Blvd?

It is owned by the State Highway Agency.