US Bridges

I-215 over Grand Montecito

Good

Clark County, Nevada · NW Las Vegas · Structure no. H2485S

Built
2017
8 years old
Condition
Good
inspected October 2023
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete Continuous
Length
156 ft
2 main spans
Daily traffic
2,025
2017 count
Owner
County
County Highway Agency

About this bridge

I-215 over Grand Montecito is a prestressed concrete continuous box beam or girders - single or spread carrying I-215 over Grand Montecito in Clark County, Nevada. It was built in 2017, so it is 8 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,025 vehicles a day, roughly 2% of them trucks, projected to reach 4,188 by 2040. The structure is 156 ft (47.4 m) long and 80 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI-215
CrossesGrand Montecito
LocationNW Las Vegas
RouteCounty Highway 215
StateNevada
Coordinates36.27807, -115.27883
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.2 US tons
Inventory rating37 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length156 ft (47.4 m)
Longest span88 ft (26.8 m)
Deck width80 ft (24.4 m)
Roadway width77 ft (23.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,025 (2017)
Projected traffic4,188 by 2040
Trucks2%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-215 over Grand Montecito built?

It was built in 2017, making it 8 years old in 2025.

What condition is I-215 over Grand Montecito in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does I-215 over Grand Montecito carry?

About 2,025 vehicles per day (2017 count), of which roughly 2% are trucks.

How long is I-215 over Grand Montecito?

The structure is 156 ft (47.4 m) long with a longest span of 88 ft (26.8 m) and a deck 80 ft wide.

Who owns I-215 over Grand Montecito?

It is owned by the County Highway Agency.