US Bridges

CC215 Beltway over Grand Montecito

Fair

Clark County, Nevada · NW Las Vegas · Structure no. H2485

Built
2001
24 years old
Condition
Fair
inspected December 2023
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete Continuous
Length
158 ft
2 main spans
Daily traffic
2,025
2017 count
Owner
County
County Highway Agency

About this bridge

CC215 Beltway over Grand Montecito is a prestressed concrete continuous box beam or girders - single or spread carrying CC215 Beltway over Grand Montecito in Clark County, Nevada. It was built in 2001, so it is 24 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,025 vehicles a day, roughly 2% of them trucks, projected to reach 4,188 by 2040. The structure is 158 ft (48.3 m) long and 91 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesCC215 Beltway
CrossesGrand Montecito
LocationNW Las Vegas
RouteCounty Highway 215
StateNevada
Coordinates36.2784, -115.27879
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating96.1 US tons
Inventory rating57.5 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length158 ft (48.3 m)
Longest span89 ft (27.2 m)
Deck width91 ft (27.6 m)
Roadway width89 ft (27.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,025 (2017)
Projected traffic4,188 by 2040
Trucks2%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CC215 Beltway over Grand Montecito built?

It was built in 2001, making it 24 years old in 2025.

What condition is CC215 Beltway over Grand Montecito in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.

How much traffic does CC215 Beltway over Grand Montecito carry?

About 2,025 vehicles per day (2017 count), of which roughly 2% are trucks.

How long is CC215 Beltway over Grand Montecito?

The structure is 158 ft (48.3 m) long with a longest span of 89 ft (27.2 m) and a deck 91 ft wide.

Who owns CC215 Beltway over Grand Montecito?

It is owned by the County Highway Agency.