Via Nobila over Pittman Wash Ped Trail
GoodClark County, Nevada · City of Henderson · Structure no. B3386
- Built
- 2024
- 1 years old
- Condition
- Good
- inspected July 2024
- Type
- Box Beam or Girders - Single or Spread
- Concrete
- Length
- 178 ft
- 2 main spans
- Daily traffic
- 2,000
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Via Nobila over Pittman Wash Ped Trail is a concrete box beam or girders - single or spread carrying Via Nobila over Pittman Wash Ped Trail in Clark County, Nevada. It was built in 2024, so it is 1 years old, younger than the Nevada average of 36.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,000 vehicles a day, roughly 2% of them trucks, projected to reach 2,200 by 2044. The structure is 178 ft (54.3 m) long and 103 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Via Nobila over Pittman Wash Ped Trail built?
It was built in 2024, making it 1 years old in 2025.
What condition is Via Nobila over Pittman Wash Ped Trail in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does Via Nobila over Pittman Wash Ped Trail carry?
About 2,000 vehicles per day (2024 count), of which roughly 2% are trucks.
How long is Via Nobila over Pittman Wash Ped Trail?
The structure is 178 ft (54.3 m) long with a longest span of 89 ft (27.1 m) and a deck 103 ft wide.
Who owns Via Nobila over Pittman Wash Ped Trail?
It is owned by the City or Municipal Highway Agency.