US Bridges

Via Inspirada over Pittman Natural Wash 9

Good

Clark County, Nevada · 2MI E of Las Vegas Blvd · Structure no. B3377

Built
2024
1 years old
Condition
Good
inspected May 2024
Type
Culvert
Concrete
Length
25 ft
2 main spans
Daily traffic
20,200
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Via Inspirada over Pittman Natural Wash 9 is a concrete culvert carrying Via Inspirada over Pittman Natural Wash 9 in Clark County, Nevada. It was built in 2024, so it is 1 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 20,200 vehicles a day, roughly 1% of them trucks, projected to reach 22,220 by 2043. The structure is 25 ft (7.5 m) long and 25 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesVia Inspirada
CrossesPittman Natural Wash 9
Location2MI E of Las Vegas Blvd
RouteCity Street 0
StateNevada
Coordinates35.93412, -115.15529
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating40.3 US tons
Inventory rating31.3 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHL 93
Structure length25 ft (7.5 m)
Longest span12 ft (3.7 m)
Deck width25 ft (7.7 m)
Roadway width25 ft (7.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic20,200 (2023)
Projected traffic22,220 by 2043
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Via Inspirada over Pittman Natural Wash 9 built?

It was built in 2024, making it 1 years old in 2025.

What condition is Via Inspirada over Pittman Natural Wash 9 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Via Inspirada over Pittman Natural Wash 9 carry?

About 20,200 vehicles per day (2023 count), of which roughly 1% are trucks.

How long is Via Inspirada over Pittman Natural Wash 9?

The structure is 25 ft (7.5 m) long with a longest span of 12 ft (3.7 m) and a deck 25 ft wide.

Who owns Via Inspirada over Pittman Natural Wash 9?

It is owned by the City or Municipal Highway Agency.