US Bridges

Via Da Vinci over Pittman Wash

Good

Clark County, Nevada · SE of Henderson · Structure no. B3139

Built
2015
10 years old
Condition
Good
inspected March 2024
Type
Culvert
Concrete
Length
45 ft
2 main spans
Daily traffic
19,400
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Via Da Vinci over Pittman Wash is a concrete culvert carrying Via Da Vinci over Pittman Wash in Clark County, Nevada. It was built in 2015, so it is 10 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 19,400 vehicles a day, roughly 1% of them trucks, projected to reach 1,034 by 2040. The structure is 45 ft (13.7 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesVia Da Vinci
CrossesPittman Wash
LocationSE of Henderson
RouteCity Street 0
StateNevada
Coordinates35.9446, -115.12823
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating91.8 US tons
Inventory rating54.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20 + Mod
Structure length45 ft (13.7 m)
Longest span22 ft (6.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic19,400 (2021)
Projected traffic1,034 by 2040
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Via Da Vinci over Pittman Wash built?

It was built in 2015, making it 10 years old in 2025.

What condition is Via Da Vinci over Pittman Wash in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Via Da Vinci over Pittman Wash carry?

About 19,400 vehicles per day (2021 count), of which roughly 1% are trucks.

How long is Via Da Vinci over Pittman Wash?

The structure is 45 ft (13.7 m) long with a longest span of 22 ft (6.7 m).

Who owns Via Da Vinci over Pittman Wash?

It is owned by the City or Municipal Highway Agency.