US Bridges

Greenway Road over Palm Canyon Channel

Good

Clark County, Nevada · Henderson · Structure no. B2448

Built
1998
27 years old
Condition
Good
inspected October 2021
Type
Culvert
Concrete
Length
38 ft
4 main spans
Daily traffic
633
2017 count
Owner
City
City or Municipal Highway Agency

About this bridge

Greenway Road over Palm Canyon Channel is a concrete culvert carrying Greenway Road over Palm Canyon Channel in Clark County, Nevada. It was built in 1998, so it is 27 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 633 vehicles a day, projected to reach 1,309 by 2040. The structure is 38 ft (11.6 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesGreenway Road
CrossesPalm Canyon Channel
LocationHenderson
RouteCity Street 0
StateNevada
Coordinates36.00004, -114.9767
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionOctober 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating86 US tons
Inventory rating51.8 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadHS 20 + Mod
Structure length38 ft (11.6 m)
Longest span8 ft (2.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic633 (2017)
Projected traffic1,309 by 2040
Trucks0%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Greenway Road over Palm Canyon Channel built?

It was built in 1998, making it 27 years old in 2025.

What condition is Greenway Road over Palm Canyon Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2021.

How much traffic does Greenway Road over Palm Canyon Channel carry?

About 633 vehicles per day (2017 count).

How long is Greenway Road over Palm Canyon Channel?

The structure is 38 ft (11.6 m) long with a longest span of 8 ft (2.4 m).

Who owns Greenway Road over Palm Canyon Channel?

It is owned by the City or Municipal Highway Agency.