US Bridges

Mission DR over Palm Cyn Chnl

Fair

Clark County, Nevada · Henderson · Structure no. B2427

Built
1998
27 years old
Condition
Fair
inspected October 2021
Type
Culvert
Concrete
Length
31 ft
2 main spans
Daily traffic
4,800
2017 count
Owner
City
City or Municipal Highway Agency

About this bridge

Mission DR over Palm Cyn Chnl is a concrete culvert carrying Mission DR over Palm Cyn Chnl in Clark County, Nevada. It was built in 1998, so it is 27 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 4,800 vehicles a day, projected to reach 9,927 by 2040. The structure is 31 ft (9.5 m) long.

CarriesMission DR
CrossesPalm Cyn Chnl
LocationHenderson
RouteCity Street 0
StateNevada
Coordinates35.99816, -114.98224
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionOctober 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating82.8 US tons
Inventory rating49.6 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20 + Mod
Structure length31 ft (9.5 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,800 (2017)
Projected traffic9,927 by 2040
Trucks0%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Mission DR over Palm Cyn Chnl built?

It was built in 1998, making it 27 years old in 2025.

What condition is Mission DR over Palm Cyn Chnl in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2021.

How much traffic does Mission DR over Palm Cyn Chnl carry?

About 4,800 vehicles per day (2017 count).

How long is Mission DR over Palm Cyn Chnl?

The structure is 31 ft (9.5 m) long with a longest span of 10 ft (3 m).

Who owns Mission DR over Palm Cyn Chnl?

It is owned by the City or Municipal Highway Agency.