US Bridges

53-0116 over Rio Puerco River

Good

Socorro County, New Mexico · 1 MI SW of US-60/BERNARDO · Structure no. 000000000009805

Built
2018
7 years old
Condition
Good
inspected February 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
570 ft
3 main spans
Daily traffic
231
2019 count
Owner
State
State Highway Agency

About this bridge

53-0116 over Rio Puerco River is a steel continuous stringer/multi-beam or girder carrying 53-0116 over Rio Puerco River in Socorro County, New Mexico. It was built in 2018, so it is 7 years old, younger than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 231 vehicles a day, projected to reach 296 by 2039. The structure is 570 ft (173.7 m) long and 29 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

Carries53-0116
CrossesRio Puerco River
Location1 MI SW of US-60/BERNARDO
RouteCounty Highway 53116
Coordinates34.40951, -106.85351
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75.3 US tons
Inventory rating45 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length570 ft (173.7 m)
Longest span190 ft (57.9 m)
Deck width29 ft (8.8 m)
Roadway width29 ft (8.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic231 (2019)
Projected traffic296 by 2039
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1.5 million (2030 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was 53-0116 over Rio Puerco River built?

It was built in 2018, making it 7 years old in 2025.

What condition is 53-0116 over Rio Puerco River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does 53-0116 over Rio Puerco River carry?

About 231 vehicles per day (2019 count).

How long is 53-0116 over Rio Puerco River?

The structure is 570 ft (173.7 m) long with a longest span of 190 ft (57.9 m) and a deck 29 ft wide.

Who owns 53-0116 over Rio Puerco River?

It is owned by the State Highway Agency.