US Bridges

US-60 over BNSF Railroad

Fair

Socorro County, New Mexico · 0.2 MI E of JCT I-25 · Structure no. 000000000008285

Built
1982
43 years old
Condition
Fair
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
127 ft
3 main spans
Daily traffic
914
2023 count
Owner
State
State Highway Agency

About this bridge

US-60 over BNSF Railroad is a prestressed concrete continuous stringer/multi-beam or girder carrying US-60 over BNSF Railroad in Socorro County, New Mexico. It was built in 1982, so it is 43 years old, younger than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 914 vehicles a day, roughly 11% of them trucks, projected to reach 1,243 by 2043. The structure is 127 ft (38.7 m) long and 43 ft wide. If it were closed, the detour would be 26.1 mi (42 km).

CarriesUS-60
CrossesBNSF Railroad
Location0.2 MI E of JCT I-25
RouteU.S. Route 60
Coordinates34.4185, -106.83351
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating63.7 US tons
Inventory rating39 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length127 ft (38.7 m)
Longest span43 ft (13.1 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic914 (2023)
Projected traffic1,243 by 2043
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRailroad
Detour if closed26.1 mi (42 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US-60 over BNSF Railroad built?

It was built in 1982, making it 43 years old in 2025.

What condition is US-60 over BNSF Railroad in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does US-60 over BNSF Railroad carry?

About 914 vehicles per day (2023 count), of which roughly 11% are trucks.

How long is US-60 over BNSF Railroad?

The structure is 127 ft (38.7 m) long with a longest span of 43 ft (13.1 m) and a deck 43 ft wide.

Who owns US-60 over BNSF Railroad?

It is owned by the State Highway Agency.