US Bridges

US-60 over Rio Grande River

Fair

Socorro County, New Mexico · 2.23 M E of I-25/US-60 · Structure no. 000000000008580

Built
1988
37 years old
Condition
Fair
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
537 ft
7 main spans
Daily traffic
914
2023 count
Owner
State
State Highway Agency

About this bridge

US-60 over Rio Grande River is a prestressed concrete continuous stringer/multi-beam or girder carrying US-60 over Rio Grande River in Socorro County, New Mexico. It was built in 1988, so it is 37 years old, younger than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 914 vehicles a day, roughly 11% of them trucks, projected to reach 1,243 by 2043. The structure is 537 ft (163.7 m) long and 43 ft wide. If it were closed, the detour would be 44.7 mi (72 km).

CarriesUS-60
CrossesRio Grande River
Location2.23 M E of I-25/US-60
RouteU.S. Route 60
Coordinates34.41745, -106.79989
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating49.2 US tons
Inventory rating30.4 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans7
Design loadHS 20
Structure length537 ft (163.7 m)
Longest span76 ft (23.2 m)
Deck width43 ft (13.1 m)
Roadway width41 ft (12.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic914 (2023)
Projected traffic1,243 by 2043
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed44.7 mi (72 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US-60 over Rio Grande River built?

It was built in 1988, making it 37 years old in 2025.

What condition is US-60 over Rio Grande River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does US-60 over Rio Grande River carry?

About 914 vehicles per day (2023 count), of which roughly 11% are trucks.

How long is US-60 over Rio Grande River?

The structure is 537 ft (163.7 m) long with a longest span of 76 ft (23.2 m) and a deck 43 ft wide.

Who owns US-60 over Rio Grande River?

It is owned by the State Highway Agency.