IRR BIA RTE N31 over Thodilidonih Wash
GoodMcKinley County, New Mexico · 9 Miles NE of Navajo Nm · Structure no. 0000N36780B0692
- Built
- 2016
- 9 years old
- Condition
- Good
- inspected March 2023
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete
- Length
- 241 ft
- 3 main spans
- Daily traffic
- 136
- 2023 count
- Owner
- Federal
- Bureau of Indian Affairs
About this bridge
IRR BIA RTE N31 over Thodilidonih Wash is a prestressed concrete box beam or girders - single or spread carrying IRR BIA RTE N31 over Thodilidonih Wash in McKinley County, New Mexico. It was built in 2016, so it is 9 years old, younger than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 136 vehicles a day, roughly 5% of them trucks, projected to reach 256 by 2032. The structure is 241 ft (73.6 m) long and 30 ft wide. If it were closed, the detour would be 9.3 mi (15 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IRR BIA RTE N31 over Thodilidonih Wash built?
It was built in 2016, making it 9 years old in 2025.
What condition is IRR BIA RTE N31 over Thodilidonih Wash in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does IRR BIA RTE N31 over Thodilidonih Wash carry?
About 136 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is IRR BIA RTE N31 over Thodilidonih Wash?
The structure is 241 ft (73.6 m) long with a longest span of 79 ft (24.1 m) and a deck 30 ft wide.
Who owns IRR BIA RTE N31 over Thodilidonih Wash?
It is owned by the Bureau of Indian Affairs.