NM-400 over I-40 Ebl/Wbl MP 33.6
FairMcKinley County, New Mexico · Junction I-40/NM-400 · Structure no. 000000000006367
- Built
- 1963
- 62 years old, rebuilt 1987
- Condition
- Fair
- inspected February 2025
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 236 ft
- 4 main spans
- Daily traffic
- 1,524
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
NM-400 over I-40 Ebl/Wbl MP 33.6 is a steel continuous stringer/multi-beam or girder carrying NM-400 over I-40 Ebl/Wbl MP 33.6 in McKinley County, New Mexico. It was built in 1963 and reconstructed in 1987, so it is 62 years old, older than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,524 vehicles a day, roughly 11% of them trucks, projected to reach 2,072 by 2043. The structure is 236 ft (71.9 m) long and 31 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NM-400 over I-40 Ebl/Wbl MP 33.6 built?
It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1987.
What condition is NM-400 over I-40 Ebl/Wbl MP 33.6 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.
How much traffic does NM-400 over I-40 Ebl/Wbl MP 33.6 carry?
About 1,524 vehicles per day (2023 count), of which roughly 11% are trucks.
How long is NM-400 over I-40 Ebl/Wbl MP 33.6?
The structure is 236 ft (71.9 m) long with a longest span of 76 ft (23.2 m) and a deck 31 ft wide.
Who owns NM-400 over I-40 Ebl/Wbl MP 33.6?
It is owned by the State Highway Agency.