US Bridges

NM-338 over I-10 EB and WB

Fair

Hidalgo County, New Mexico · Junction of I-10/NM-338 · Structure no. 000000000006113

Built
1959
66 years old
Condition
Fair
inspected August 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
259 ft
5 main spans
Daily traffic
344
2023 count
Owner
State
State Highway Agency

About this bridge

NM-338 over I-10 EB and WB is a prestressed concrete box beam or girders - multiple carrying NM-338 over I-10 EB and WB in Hidalgo County, New Mexico. It was built in 1959, so it is 66 years old, older than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 344 vehicles a day, roughly 11% of them trucks, projected to reach 467 by 2043. The structure is 259 ft (79 m) long and 32 ft wide.

CarriesNM-338
CrossesI-10 EB and WB
LocationJunction of I-10/NM-338
RouteState Highway 338
Coordinates32.28028, -108.88013
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating64.8 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20
Structure length259 ft (79 m)
Longest span53 ft (16.2 m)
Deck width32 ft (9.8 m)
Roadway width28 ft (8.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic344 (2023)
Projected traffic467 by 2043
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was NM-338 over I-10 EB and WB built?

It was built in 1959, making it 66 years old in 2025.

What condition is NM-338 over I-10 EB and WB in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.

How much traffic does NM-338 over I-10 EB and WB carry?

About 344 vehicles per day (2023 count), of which roughly 11% are trucks.

How long is NM-338 over I-10 EB and WB?

The structure is 259 ft (79 m) long with a longest span of 53 ft (16.2 m) and a deck 32 ft wide.

Who owns NM-338 over I-10 EB and WB?

It is owned by the State Highway Agency.