US Bridges

09-Z000 over Ingram Dam Channel

Good

Curry County, New Mexico · 0.5 MI E of Norris St. · Structure no. 000000000009067

Built
1999
26 years old
Condition
Good
inspected April 2024
Type
Slab
Concrete Continuous
Length
58 ft
2 main spans
Daily traffic
211
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

09-Z000 over Ingram Dam Channel is a concrete continuous slab carrying 09-Z000 over Ingram Dam Channel in Curry County, New Mexico. It was built in 1999, so it is 26 years old, younger than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 211 vehicles a day, projected to reach 286 by 2043. The structure is 58 ft (17.7 m) long and 35 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

Carries09-Z000
CrossesIngram Dam Channel
Location0.5 MI E of Norris St.
RouteCounty Highway 9000
Coordinates34.39019, -103.16954
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating78.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length58 ft (17.7 m)
Longest span28 ft (8.5 m)
Deck width35 ft (10.7 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic211 (2023)
Projected traffic286 by 2043
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 09-Z000 over Ingram Dam Channel built?

It was built in 1999, making it 26 years old in 2025.

What condition is 09-Z000 over Ingram Dam Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does 09-Z000 over Ingram Dam Channel carry?

About 211 vehicles per day (2023 count).

How long is 09-Z000 over Ingram Dam Channel?

The structure is 58 ft (17.7 m) long with a longest span of 28 ft (8.5 m) and a deck 35 ft wide.

Who owns 09-Z000 over Ingram Dam Channel?

It is owned by the City or Municipal Highway Agency.