US Bridges

NM-53 over Hondo Canyon Drainage

Good

Cibola County, New Mexico · 3.6 MI S of JCT I-40 · Structure no. 000000000010021

Built
1988
37 years old
Condition
Good
inspected August 2021
Type
Culvert
Concrete
Length
31 ft
3 main spans
Daily traffic
1,071
2023 count
Owner
State
State Highway Agency

About this bridge

NM-53 over Hondo Canyon Drainage is a concrete culvert carrying NM-53 over Hondo Canyon Drainage in Cibola County, New Mexico. It was built in 1988, so it is 37 years old, younger than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,071 vehicles a day, roughly 11% of them trucks, projected to reach 1,456 by 2043. The structure is 31 ft (9.5 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesNM-53
CrossesHondo Canyon Drainage
Location3.6 MI S of JCT I-40
RouteState Highway 53
Coordinates35.1035, -107.88461
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionAugust 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length31 ft (9.5 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,071 (2023)
Projected traffic1,456 by 2043
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was NM-53 over Hondo Canyon Drainage built?

It was built in 1988, making it 37 years old in 2025.

What condition is NM-53 over Hondo Canyon Drainage in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2021.

How much traffic does NM-53 over Hondo Canyon Drainage carry?

About 1,071 vehicles per day (2023 count), of which roughly 11% are trucks.

How long is NM-53 over Hondo Canyon Drainage?

The structure is 31 ft (9.5 m) long with a longest span of 10 ft (3 m).

Who owns NM-53 over Hondo Canyon Drainage?

It is owned by the State Highway Agency.