NM-117 over I-40 Ebl/Wbl MP 89.44
FairCibola County, New Mexico · JCT I-40/NM-117 · Structure no. 000000000005973
- Built
- 1959
- 66 years old, rebuilt 1990
- Condition
- Fair
- inspected December 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 236 ft
- 4 main spans
- Daily traffic
- 1,206
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
NM-117 over I-40 Ebl/Wbl MP 89.44 is a prestressed concrete box beam or girders - multiple carrying NM-117 over I-40 Ebl/Wbl MP 89.44 in Cibola County, New Mexico. It was built in 1959 and reconstructed in 1990, so it is 66 years old, older than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,206 vehicles a day, roughly 11% of them trucks, projected to reach 1,640 by 2043. The structure is 236 ft (71.8 m) long and 39 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NM-117 over I-40 Ebl/Wbl MP 89.44 built?
It was built in 1959, making it 66 years old in 2025. It was reconstructed in 1990.
What condition is NM-117 over I-40 Ebl/Wbl MP 89.44 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does NM-117 over I-40 Ebl/Wbl MP 89.44 carry?
About 1,206 vehicles per day (2023 count), of which roughly 11% are trucks.
How long is NM-117 over I-40 Ebl/Wbl MP 89.44?
The structure is 236 ft (71.8 m) long with a longest span of 66 ft (20.2 m) and a deck 39 ft wide.
Who owns NM-117 over I-40 Ebl/Wbl MP 89.44?
It is owned by the State Highway Agency.