US-285 over Walnut Canyon
FairChaves County, New Mexico · 11.2 MI N of US82/ARTESIA · Structure no. 000000000006635
- Built
- 1965
- 60 years old
- Condition
- Fair
- inspected January 2023
- Type
- Culvert
- Concrete
- Length
- 39 ft
- 3 main spans
- Daily traffic
- 9,811
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
US-285 over Walnut Canyon is a concrete culvert carrying US-285 over Walnut Canyon in Chaves County, New Mexico. It was built in 1965, so it is 60 years old, older than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 9,811 vehicles a day, roughly 17% of them trucks, projected to reach 13,342 by 2043. The structure is 39 ft (11.9 m) long.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US-285 over Walnut Canyon built?
It was built in 1965, making it 60 years old in 2025.
What condition is US-285 over Walnut Canyon in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.
How much traffic does US-285 over Walnut Canyon carry?
About 9,811 vehicles per day (2023 count), of which roughly 17% are trucks.
How long is US-285 over Walnut Canyon?
The structure is 39 ft (11.9 m) long with a longest span of 12 ft (3.7 m).
Who owns US-285 over Walnut Canyon?
It is owned by the State Highway Agency.