US Bridges

US-285 Sbl over Rio Felix

Fair

Chaves County, New Mexico · 14.2 MI S of NM-2/ROSWELL · Structure no. 000000000009030

Built
1998
27 years old
Condition
Fair
inspected November 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
292 ft
3 main spans
Daily traffic
9,623
2023 count
Owner
State
State Highway Agency

About this bridge

US-285 Sbl over Rio Felix is a prestressed concrete continuous stringer/multi-beam or girder carrying US-285 Sbl over Rio Felix in Chaves County, New Mexico. It was built in 1998, so it is 27 years old, younger than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 9,623 vehicles a day, roughly 17% of them trucks, projected to reach 13,087 by 2043. The structure is 292 ft (89 m) long and 39 ft wide.

CarriesUS-285 Sbl
CrossesRio Felix
Location14.2 MI S of NM-2/ROSWELL
RouteU.S. Route 285
Coordinates33.09903, -104.44198
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating45 US tons
Inventory rating26.8 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length292 ft (89 m)
Longest span95 ft (29 m)
Deck width39 ft (11.9 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,623 (2023)
Projected traffic13,087 by 2043
Trucks17%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US-285 Sbl over Rio Felix built?

It was built in 1998, making it 27 years old in 2025.

What condition is US-285 Sbl over Rio Felix in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does US-285 Sbl over Rio Felix carry?

About 9,623 vehicles per day (2023 count), of which roughly 17% are trucks.

How long is US-285 Sbl over Rio Felix?

The structure is 292 ft (89 m) long with a longest span of 95 ft (29 m) and a deck 39 ft wide.

Who owns US-285 Sbl over Rio Felix?

It is owned by the State Highway Agency.