I-40 Ebl over Rio Puerco
GoodBernalillo County, New Mexico · 13.8 MI E of NM-6 · Structure no. 000000000009545
- Built
- 2011
- 14 years old
- Condition
- Good
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 299 ft
- 3 main spans
- Daily traffic
- 28,766
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-40 Ebl over Rio Puerco is a prestressed concrete continuous stringer/multi-beam or girder carrying I-40 Ebl over Rio Puerco in Bernalillo County, New Mexico. It was built in 2011, so it is 14 years old, younger than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 28,766 vehicles a day, roughly 14% of them trucks, projected to reach 39,121 by 2043. The structure is 299 ft (91.1 m) long and 53 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-40 Ebl over Rio Puerco built?
It was built in 2011, making it 14 years old in 2025.
What condition is I-40 Ebl over Rio Puerco in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does I-40 Ebl over Rio Puerco carry?
About 28,766 vehicles per day (2023 count), of which roughly 14% are trucks.
How long is I-40 Ebl over Rio Puerco?
The structure is 299 ft (91.1 m) long with a longest span of 100 ft (30.5 m) and a deck 53 ft wide.
Who owns I-40 Ebl over Rio Puerco?
It is owned by the State Highway Agency.