US Bridges

EB Frontage Road over I-40 WB Off-Ramp

Good

Bernalillo County, New Mexico · Rio Puerco Interchange · Structure no. 000000000009515

Built
2014
11 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
102 ft
1 main span
Daily traffic
2,198
2023 count
Owner
State
State Highway Agency

About this bridge

EB Frontage Road over I-40 WB Off-Ramp is a prestressed concrete stringer/multi-beam or girder carrying EB Frontage Road over I-40 WB Off-Ramp in Bernalillo County, New Mexico. It was built in 2014, so it is 11 years old, younger than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,198 vehicles a day, roughly 5% of them trucks, projected to reach 2,989 by 2043. The structure is 102 ft (31.1 m) long and 27 ft wide.

CarriesEB Frontage Road
CrossesI-40 WB Off-Ramp
LocationRio Puerco Interchange
RouteState Highway 4047
Coordinates35.03536, -106.93375
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment6: Equal to present minimum criteria
Operating rating81 US tons
Inventory rating37.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length102 ft (31.1 m)
Longest span97 ft (29.6 m)
Deck width27 ft (8.2 m)
Roadway width25 ft (7.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,198 (2023)
Projected traffic2,989 by 2043
Trucks5%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was EB Frontage Road over I-40 WB Off-Ramp built?

It was built in 2014, making it 11 years old in 2025.

What condition is EB Frontage Road over I-40 WB Off-Ramp in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does EB Frontage Road over I-40 WB Off-Ramp carry?

About 2,198 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is EB Frontage Road over I-40 WB Off-Ramp?

The structure is 102 ft (31.1 m) long with a longest span of 97 ft (29.6 m) and a deck 27 ft wide.

Who owns EB Frontage Road over I-40 WB Off-Ramp?

It is owned by the State Highway Agency.