US Bridges

Balloon Park over North LA Cueva Channel

Good

Bernalillo County, New Mexico · Balloon Fiesta Park · Structure no. 000000000009329

Built
2003
22 years old
Condition
Good
inspected December 2024
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete
Length
68 ft
41 main spans
Daily traffic
4,400
2017 count
Owner
City
City or Municipal Highway Agency

About this bridge

Balloon Park over North LA Cueva Channel is a prestressed concrete box beam or girders - single or spread carrying Balloon Park over North LA Cueva Channel in Bernalillo County, New Mexico. It was built in 2003, so it is 22 years old, younger than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,400 vehicles a day, roughly 5% of them trucks, projected to reach 6,600 by 2037. The structure is 68 ft (20.8 m) long and 40 ft wide.

CarriesBalloon Park
CrossesNorth LA Cueva Channel
LocationBalloon Fiesta Park
RouteCity Street 1001
Coordinates35.19222, -106.60033
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating59.4 US tons
Inventory rating36.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans41
Design loadHS 20
Structure length68 ft (20.8 m)
Longest span41 ft (12.5 m)
Deck width40 ft (12.2 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic4,400 (2017)
Projected traffic6,600 by 2037
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Balloon Park over North LA Cueva Channel built?

It was built in 2003, making it 22 years old in 2025.

What condition is Balloon Park over North LA Cueva Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does Balloon Park over North LA Cueva Channel carry?

About 4,400 vehicles per day (2017 count), of which roughly 5% are trucks.

How long is Balloon Park over North LA Cueva Channel?

The structure is 68 ft (20.8 m) long with a longest span of 41 ft (12.5 m) and a deck 40 ft wide.

Who owns Balloon Park over North LA Cueva Channel?

It is owned by the City or Municipal Highway Agency.