NM-528 WB over North Diversion Channel
FairBernalillo County, New Mexico · 1.3 M W JCT I-25/ALAMEDA · Structure no. 000000000008655
- Built
- 1987
- 38 years old
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 106 ft
- 1 main span
- Daily traffic
- 25,771
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
NM-528 WB over North Diversion Channel is a prestressed concrete stringer/multi-beam or girder carrying NM-528 WB over North Diversion Channel in Bernalillo County, New Mexico. It was built in 1987, so it is 38 years old, younger than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 25,771 vehicles a day, roughly 8% of them trucks, projected to reach 35,048 by 2042. The structure is 106 ft (32.3 m) long and 43 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NM-528 WB over North Diversion Channel built?
It was built in 1987, making it 38 years old in 2025.
What condition is NM-528 WB over North Diversion Channel in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does NM-528 WB over North Diversion Channel carry?
About 25,771 vehicles per day (2022 count), of which roughly 8% are trucks.
How long is NM-528 WB over North Diversion Channel?
The structure is 106 ft (32.3 m) long with a longest span of 103 ft (31.4 m) and a deck 43 ft wide.
Who owns NM-528 WB over North Diversion Channel?
It is owned by the State Highway Agency.