FL-4048 over Embudito Arroyo
FairBernalillo County, New Mexico · 0.7 MI E of Eubank Blvd · Structure no. 000000000008195
- Built
- 1977
- 48 years old
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 67 ft
- 1 main span
- Daily traffic
- 14,446
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
FL-4048 over Embudito Arroyo is a prestressed concrete stringer/multi-beam or girder carrying FL-4048 over Embudito Arroyo in Bernalillo County, New Mexico. It was built in 1977, so it is 48 years old, younger than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 14,446 vehicles a day, roughly 5% of them trucks, projected to reach 19,646 by 2043. The structure is 67 ft (20.4 m) long and 80 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FL-4048 over Embudito Arroyo built?
It was built in 1977, making it 48 years old in 2025.
What condition is FL-4048 over Embudito Arroyo in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does FL-4048 over Embudito Arroyo carry?
About 14,446 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is FL-4048 over Embudito Arroyo?
The structure is 67 ft (20.4 m) long with a longest span of 65 ft (19.8 m) and a deck 80 ft wide.
Who owns FL-4048 over Embudito Arroyo?
It is owned by the City or Municipal Highway Agency.