US Bridges

FL-4065 over N Glenwood Hills Arroyo

Fair

Bernalillo County, New Mexico · 0.33 MI N of Candelaria · Structure no. 000000000007967

Built
1978
47 years old
Condition
Fair
inspected July 2023
Type
Culvert
Concrete
Length
28 ft
1 main span
Daily traffic
25,171
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

FL-4065 over N Glenwood Hills Arroyo is a concrete culvert carrying FL-4065 over N Glenwood Hills Arroyo in Bernalillo County, New Mexico. It was built in 1978, so it is 47 years old, younger than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 25,171 vehicles a day, roughly 12% of them trucks, projected to reach 34,232 by 2043. The structure is 28 ft (8.5 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesFL-4065
CrossesN Glenwood Hills Arroyo
Location0.33 MI N of Candelaria
RouteCity Street 4065
Coordinates35.12106, -106.51559
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating98.2 US tons
Inventory rating64.3 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20
Structure length28 ft (8.5 m)
Longest span24 ft (7.3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25,171 (2023)
Projected traffic34,232 by 2043
Trucks12%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was FL-4065 over N Glenwood Hills Arroyo built?

It was built in 1978, making it 47 years old in 2025.

What condition is FL-4065 over N Glenwood Hills Arroyo in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.

How much traffic does FL-4065 over N Glenwood Hills Arroyo carry?

About 25,171 vehicles per day (2023 count), of which roughly 12% are trucks.

How long is FL-4065 over N Glenwood Hills Arroyo?

The structure is 28 ft (8.5 m) long with a longest span of 24 ft (7.3 m).

Who owns FL-4065 over N Glenwood Hills Arroyo?

It is owned by the City or Municipal Highway Agency.