US Bridges

Turnpike Sno over Elizabeth Avenue

Fair

Union County, New Jersey · .6 MI N Elizabeth River · Structure no. M10035N

Built
1970
55 years old
Condition
Fair
inspected March 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
161 ft
3 main spans
Daily traffic
62,785
2023 count
Owner
Toll Authority
State Toll Authority

About this bridge

Turnpike Sno over Elizabeth Avenue is a steel stringer/multi-beam or girder carrying Turnpike Sno over Elizabeth Avenue in Union County, New Jersey. It was built in 1970, so it is 55 years old, younger than the New Jersey average of 58.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 62,785 vehicles a day, roughly 24% of them trucks, projected to reach 82,500 by 2043. The structure is 161 ft (49.1 m) long and 66 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesTurnpike Sno
CrossesElizabeth Avenue
Location.6 MI N Elizabeth River
RouteInterstate 95
Coordinates40.65161, -74.19611
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating56.1 US tons
Inventory rating43.2 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length161 ft (49.1 m)
Longest span82 ft (25 m)
Deck width66 ft (20.1 m)
Roadway width62 ft (18.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic62,785 (2023)
Projected traffic82,500 by 2043
Trucks24%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Turnpike Sno over Elizabeth Avenue built?

It was built in 1970, making it 55 years old in 2025.

What condition is Turnpike Sno over Elizabeth Avenue in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does Turnpike Sno over Elizabeth Avenue carry?

About 62,785 vehicles per day (2023 count), of which roughly 24% are trucks.

How long is Turnpike Sno over Elizabeth Avenue?

The structure is 161 ft (49.1 m) long with a longest span of 82 ft (25 m) and a deck 66 ft wide.

Who owns Turnpike Sno over Elizabeth Avenue?

It is owned by the State Toll Authority.