Njtpk INT13 Rp Tni over Njtpk Sno-Elizabeth Riv.
FairUnion County, New Jersey · .15 MI S Interchange 13 · Structure no. M09970A
- Built
- 1970
- 55 years old
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 577 ft
- 8 main spans
- Daily traffic
- 13,700
- 2023 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
Njtpk INT13 Rp Tni over Njtpk Sno-Elizabeth Riv. is a steel stringer/multi-beam or girder carrying Njtpk INT13 Rp Tni over Njtpk Sno-Elizabeth Riv. in Union County, New Jersey. It was built in 1970, so it is 55 years old, younger than the New Jersey average of 58.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 13,700 vehicles a day, roughly 1% of them trucks, projected to reach 16,822 by 2043. The structure is 577 ft (175.9 m) long and 30 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Njtpk INT13 Rp Tni over Njtpk Sno-Elizabeth Riv. built?
It was built in 1970, making it 55 years old in 2025.
What condition is Njtpk INT13 Rp Tni over Njtpk Sno-Elizabeth Riv. in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Njtpk INT13 Rp Tni over Njtpk Sno-Elizabeth Riv. carry?
About 13,700 vehicles per day (2023 count), of which roughly 1% are trucks.
How long is Njtpk INT13 Rp Tni over Njtpk Sno-Elizabeth Riv.?
The structure is 577 ft (175.9 m) long with a longest span of 83 ft (25.3 m) and a deck 30 ft wide.
Who owns Njtpk INT13 Rp Tni over Njtpk Sno-Elizabeth Riv.?
It is owned by the State Toll Authority.