Njtpk Sni Rwy over Rahway River
FairUnion County, New Jersey · .4 MI N Interchange 12 · Structure no. M09623N
- Built
- 1950
- 75 years old, rebuilt 1960
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 507 ft
- 7 main spans
- Daily traffic
- 67,788
- 2023 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
Njtpk Sni Rwy over Rahway River is a steel stringer/multi-beam or girder carrying Njtpk Sni Rwy over Rahway River in Union County, New Jersey. It was built in 1950 and reconstructed in 1960, so it is 75 years old, older than the New Jersey average of 58.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 67,788 vehicles a day, roughly 1% of them trucks, projected to reach 68,707 by 2043. The structure is 507 ft (154.5 m) long and 72 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Njtpk Sni Rwy over Rahway River built?
It was built in 1950, making it 75 years old in 2025. It was reconstructed in 1960.
What condition is Njtpk Sni Rwy over Rahway River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does Njtpk Sni Rwy over Rahway River carry?
About 67,788 vehicles per day (2023 count), of which roughly 1% are trucks.
How long is Njtpk Sni Rwy over Rahway River?
The structure is 507 ft (154.5 m) long with a longest span of 85 ft (25.9 m) and a deck 72 ft wide.
Who owns Njtpk Sni Rwy over Rahway River?
It is owned by the State Toll Authority.