Goethals Bridge EB over Conrail Njtpk Njtpk Ramp
GoodUnion County, New Jersey · 0.3 MI S of Elizabeth Riv · Structure no. 3800071
- Built
- 2017
- 8 years old
- Condition
- Good
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 1,023 ft
- 8 main spans
- Daily traffic
- 32,727
- 2023 count
- Owner
- State
- Other State Agency
About this bridge
Goethals Bridge EB over Conrail Njtpk Njtpk Ramp is a prestressed concrete continuous stringer/multi-beam or girder carrying Goethals Bridge EB over Conrail Njtpk Njtpk Ramp in Union County, New Jersey. It was built in 2017, so it is 8 years old, younger than the New Jersey average of 58.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 32,727 vehicles a day, roughly 9% of them trucks, projected to reach 39,933 by 2043. The structure is 1,023 ft (311.8 m) long and 68 ft wide. If it were closed, the detour would be 19.3 mi (31 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Goethals Bridge EB over Conrail Njtpk Njtpk Ramp built?
It was built in 2017, making it 8 years old in 2025.
What condition is Goethals Bridge EB over Conrail Njtpk Njtpk Ramp in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does Goethals Bridge EB over Conrail Njtpk Njtpk Ramp carry?
About 32,727 vehicles per day (2023 count), of which roughly 9% are trucks.
How long is Goethals Bridge EB over Conrail Njtpk Njtpk Ramp?
The structure is 1,023 ft (311.8 m) long with a longest span of 147 ft (44.8 m) and a deck 68 ft wide.
Who owns Goethals Bridge EB over Conrail Njtpk Njtpk Ramp?
It is owned by the Other State Agency and maintained by the Private (other than railroad).