Garden ST Parkway over Chestnut Street (cr 619)
FairUnion County, New Jersey · 1.7 Miles South of I-78 · Structure no. 361410T
- Built
- 1950
- 75 years old, rebuilt 1976
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 96 ft
- 1 main span
- Daily traffic
- 218,521
- 2023 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
Garden ST Parkway over Chestnut Street (cr 619) is a steel stringer/multi-beam or girder carrying Garden ST Parkway over Chestnut Street (cr 619) in Union County, New Jersey. It was built in 1950 and reconstructed in 1976, so it is 75 years old, older than the New Jersey average of 58.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 218,521 vehicles a day, roughly 1% of them trucks, projected to reach 23,758 by 2043. The structure is 96 ft (29.3 m) long and 153 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Garden ST Parkway over Chestnut Street (cr 619) built?
It was built in 1950, making it 75 years old in 2025. It was reconstructed in 1976.
What condition is Garden ST Parkway over Chestnut Street (cr 619) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Garden ST Parkway over Chestnut Street (cr 619) carry?
About 218,521 vehicles per day (2023 count), of which roughly 1% are trucks.
How long is Garden ST Parkway over Chestnut Street (cr 619)?
The structure is 96 ft (29.3 m) long with a longest span of 94 ft (28.7 m) and a deck 153 ft wide.
Who owns Garden ST Parkway over Chestnut Street (cr 619)?
It is owned by the State Toll Authority.