US Bridges

I-287 NB over Rt 22 Eastbound

Fair

Somerset County, New Jersey · .8MI North of Route 28 · Structure no. 1813150

Built
1960
65 years old, rebuilt 1996
Condition
Fair
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
175 ft
3 main spans
Daily traffic
104,530
2023 count
Owner
State
State Highway Agency

About this bridge

I-287 NB over Rt 22 Eastbound is a prestressed concrete stringer/multi-beam or girder carrying I-287 NB over Rt 22 Eastbound in Somerset County, New Jersey. It was built in 1960 and reconstructed in 1996, so it is 65 years old, older than the New Jersey average of 58.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 104,530 vehicles a day, roughly 9% of them trucks, projected to reach 127,429 by 2043. The structure is 175 ft (53.3 m) long and 78 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-287 NB
CrossesRt 22 Eastbound
Location.8MI North of Route 28
RouteInterstate 287
Coordinates40.575, -74.56677
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57 US tons
Inventory rating34 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length175 ft (53.3 m)
Longest span81 ft (24.7 m)
Deck width78 ft (23.8 m)
Roadway width74 ft (22.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic104,530 (2023)
Projected traffic127,429 by 2043
Trucks9%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$303,000 (2017 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-287 NB over Rt 22 Eastbound built?

It was built in 1960, making it 65 years old in 2025. It was reconstructed in 1996.

What condition is I-287 NB over Rt 22 Eastbound in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.

How much traffic does I-287 NB over Rt 22 Eastbound carry?

About 104,530 vehicles per day (2023 count), of which roughly 9% are trucks.

How long is I-287 NB over Rt 22 Eastbound?

The structure is 175 ft (53.3 m) long with a longest span of 81 ft (24.7 m) and a deck 78 ft wide.

Who owns I-287 NB over Rt 22 Eastbound?

It is owned by the State Highway Agency.