Parkway S over Norfolk Southern
FairPassaic County, New Jersey · .75 MI W of Gsp&passaic R · Structure no. 361572S
- Built
- 1954
- 71 years old, rebuilt 1962
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 157 ft
- 3 main spans
- Daily traffic
- 45,165
- 2024 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
Parkway S over Norfolk Southern is a steel stringer/multi-beam or girder carrying Parkway S over Norfolk Southern in Passaic County, New Jersey. It was built in 1954 and reconstructed in 1962, so it is 71 years old, older than the New Jersey average of 58.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 45,165 vehicles a day, roughly 1% of them trucks, projected to reach 54,198 by 2044. The structure is 157 ft (47.9 m) long and 54 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Parkway S over Norfolk Southern built?
It was built in 1954, making it 71 years old in 2025. It was reconstructed in 1962.
What condition is Parkway S over Norfolk Southern in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does Parkway S over Norfolk Southern carry?
About 45,165 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is Parkway S over Norfolk Southern?
The structure is 157 ft (47.9 m) long with a longest span of 66 ft (20.1 m) and a deck 54 ft wide.
Who owns Parkway S over Norfolk Southern?
It is owned by the State Toll Authority.