Garden ST Pkwy NB over Allwood RD (cr 602)
FairPassaic County, New Jersey · At Gsp & Nj 3 Junction · Structure no. 361543N
- Built
- 1953
- 72 years old
- Condition
- Fair
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 71 ft
- 1 main span
- Daily traffic
- 79,468
- 2024 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
Garden ST Pkwy NB over Allwood RD (cr 602) is a steel stringer/multi-beam or girder carrying Garden ST Pkwy NB over Allwood RD (cr 602) in Passaic County, New Jersey. It was built in 1953, so it is 72 years old, older than the New Jersey average of 58.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 79,468 vehicles a day, roughly 1% of them trucks, projected to reach 96,966 by 2044. The structure is 71 ft (21.6 m) long and 99 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Garden ST Pkwy NB over Allwood RD (cr 602) built?
It was built in 1953, making it 72 years old in 2025.
What condition is Garden ST Pkwy NB over Allwood RD (cr 602) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does Garden ST Pkwy NB over Allwood RD (cr 602) carry?
About 79,468 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is Garden ST Pkwy NB over Allwood RD (cr 602)?
The structure is 71 ft (21.6 m) long with a longest span of 65 ft (19.8 m) and a deck 99 ft wide.
Who owns Garden ST Pkwy NB over Allwood RD (cr 602)?
It is owned by the State Toll Authority.