US Bridges

Geoffrey Way over Point View Reser Spillwy

Fair

Passaic County, New Jersey · 0.5 Mi.Sw. of Hamburg Tpk · Structure no. 1614001

Built
1962
63 years old
Condition
Fair
inspected April 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
106 ft
2 main spans
Daily traffic
2,010
2023 count
Owner
Private
Private (other than railroad)

About this bridge

Geoffrey Way over Point View Reser Spillwy is a prestressed concrete stringer/multi-beam or girder carrying Geoffrey Way over Point View Reser Spillwy in Passaic County, New Jersey. It was built in 1962, so it is 63 years old, older than the New Jersey average of 58.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,010 vehicles a day, roughly 1% of them trucks, projected to reach 2,450 by 2043. The structure is 106 ft (32.3 m) long and 74 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesGeoffrey Way
CrossesPoint View Reser Spillwy
Location0.5 Mi.Sw. of Hamburg Tpk
RouteCity Street 0
Coordinates40.97207, -74.25576
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating56 US tons
Inventory rating34 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length106 ft (32.3 m)
Longest span53 ft (16.2 m)
Deck width74 ft (22.7 m)
Roadway width45 ft (13.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,010 (2023)
Projected traffic2,450 by 2043
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerPrivate (other than railroad)
Maintained byPrivate (other than railroad)
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Geoffrey Way over Point View Reser Spillwy built?

It was built in 1962, making it 63 years old in 2025.

What condition is Geoffrey Way over Point View Reser Spillwy in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does Geoffrey Way over Point View Reser Spillwy carry?

About 2,010 vehicles per day (2023 count), of which roughly 1% are trucks.

How long is Geoffrey Way over Point View Reser Spillwy?

The structure is 106 ft (32.3 m) long with a longest span of 53 ft (16.2 m) and a deck 74 ft wide.

Who owns Geoffrey Way over Point View Reser Spillwy?

It is owned by the Private (other than railroad).