US Bridges

I-80 Ramp C over Nj Route 19 & Ramp De

Fair

Passaic County, New Jersey · Nj 19 NB Exit to I-80 WB · Structure no. 1610176

Built
1993
32 years old
Condition
Fair
inspected July 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
729 ft
6 main spans
Daily traffic
7,661
2024 count
Owner
State
State Highway Agency

About this bridge

I-80 Ramp C over Nj Route 19 & Ramp De is a steel continuous stringer/multi-beam or girder carrying I-80 Ramp C over Nj Route 19 & Ramp De in Passaic County, New Jersey. It was built in 1993, so it is 32 years old, younger than the New Jersey average of 58.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 7,661 vehicles a day, roughly 5% of them trucks, projected to reach 9,348 by 2044. The structure is 729 ft (222.2 m) long and 28 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-80 Ramp C
CrossesNj Route 19 & Ramp De
LocationNj 19 NB Exit to I-80 WB
RouteInterstate 80
Coordinates40.91069, -74.17534
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating72 US tons
Inventory rating43 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans6 (+4 approach)
Design loadHS 20 + Mod
Structure length729 ft (222.2 m)
Longest span84 ft (25.6 m)
Deck width28 ft (8.4 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,661 (2024)
Projected traffic9,348 by 2044
Trucks5%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-80 Ramp C over Nj Route 19 & Ramp De built?

It was built in 1993, making it 32 years old in 2025.

What condition is I-80 Ramp C over Nj Route 19 & Ramp De in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does I-80 Ramp C over Nj Route 19 & Ramp De carry?

About 7,661 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is I-80 Ramp C over Nj Route 19 & Ramp De?

The structure is 729 ft (222.2 m) long with a longest span of 84 ft (25.6 m) and a deck 28 ft wide.

Who owns I-80 Ramp C over Nj Route 19 & Ramp De?

It is owned by the State Highway Agency.