I-80 over Main & Marshall Streets
FairPassaic County, New Jersey · 0.1 Mile East of Exit 57 · Structure no. 1610171
- Built
- 1971
- 54 years old
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 198 ft
- 2 main spans
- Daily traffic
- 131,900
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I-80 over Main & Marshall Streets is a steel stringer/multi-beam or girder carrying I-80 over Main & Marshall Streets in Passaic County, New Jersey. It was built in 1971, so it is 54 years old, younger than the New Jersey average of 58.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 131,900 vehicles a day, roughly 9% of them trucks, projected to reach 158,300 by 2044. The structure is 198 ft (60.4 m) long and 137 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-80 over Main & Marshall Streets built?
It was built in 1971, making it 54 years old in 2025.
What condition is I-80 over Main & Marshall Streets in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does I-80 over Main & Marshall Streets carry?
About 131,900 vehicles per day (2024 count), of which roughly 9% are trucks.
How long is I-80 over Main & Marshall Streets?
The structure is 198 ft (60.4 m) long with a longest span of 97 ft (29.6 m) and a deck 137 ft wide.
Who owns I-80 over Main & Marshall Streets?
It is owned by the State Highway Agency.