US Bridges

Route Nj 3 over Norfolk Southern

Fair

Passaic County, New Jersey · 2.8 MI SE of 3-46 JCT · Structure no. 1601154

Built
1948
77 years old
Condition
Fair
inspected April 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
126 ft
3 main spans
Daily traffic
138,590
2024 count
Owner
State
State Highway Agency

About this bridge

Route Nj 3 over Norfolk Southern is a steel stringer/multi-beam or girder carrying Route Nj 3 over Norfolk Southern in Passaic County, New Jersey. It was built in 1948, so it is 77 years old, older than the New Jersey average of 58.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 138,590 vehicles a day, roughly 5% of them trucks, projected to reach 169,105 by 2044. The structure is 126 ft (38.4 m) long and 115 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesRoute Nj 3
CrossesNorfolk Southern
Location2.8 MI SE of 3-46 JCT
RouteState Highway 3
Coordinates40.83886, -74.1582
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64 US tons
Inventory rating38 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length126 ft (38.4 m)
Longest span39 ft (11.9 m)
Deck width115 ft (35 m)
Roadway width98 ft (29.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic138,590 (2024)
Projected traffic169,105 by 2044
Trucks5%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesRailroad
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Route Nj 3 over Norfolk Southern built?

It was built in 1948, making it 77 years old in 2025.

What condition is Route Nj 3 over Norfolk Southern in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does Route Nj 3 over Norfolk Southern carry?

About 138,590 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is Route Nj 3 over Norfolk Southern?

The structure is 126 ft (38.4 m) long with a longest span of 39 ft (11.9 m) and a deck 115 ft wide.

Who owns Route Nj 3 over Norfolk Southern?

It is owned by the State Highway Agency.