US Bridges

I-195 WB over Allaire Prk Towpth&canal

Good

Monmouth County, New Jersey · 0.56 MI E of CR 547 Jct. · Structure no. 1333171

Built
1980
45 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
109 ft
1 main span
Daily traffic
33,969
2022 count
Owner
State
State Highway Agency

About this bridge

I-195 WB over Allaire Prk Towpth&canal is a steel stringer/multi-beam or girder carrying I-195 WB over Allaire Prk Towpth&canal in Monmouth County, New Jersey. It was built in 1980, so it is 45 years old, younger than the New Jersey average of 58.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 33,969 vehicles a day, roughly 9% of them trucks, projected to reach 41,449 by 2042. The structure is 109 ft (33.2 m) long and 48 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-195 WB
CrossesAllaire Prk Towpth&canal
Location0.56 MI E of CR 547 Jct.
RouteInterstate 195
Coordinates40.16445, -74.14166
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating95 US tons
Inventory rating57 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length109 ft (33.2 m)
Longest span105 ft (32 m)
Deck width48 ft (14.7 m)
Roadway width43 ft (13 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic33,969 (2022)
Projected traffic41,449 by 2042
Trucks9%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I-195 WB over Allaire Prk Towpth&canal built?

It was built in 1980, making it 45 years old in 2025.

What condition is I-195 WB over Allaire Prk Towpth&canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does I-195 WB over Allaire Prk Towpth&canal carry?

About 33,969 vehicles per day (2022 count), of which roughly 9% are trucks.

How long is I-195 WB over Allaire Prk Towpth&canal?

The structure is 109 ft (33.2 m) long with a longest span of 105 ft (32 m) and a deck 48 ft wide.

Who owns I-195 WB over Allaire Prk Towpth&canal?

It is owned by the State Highway Agency.