US Bridges

Nj 35 WB Ramp over Nj 35 & Nj 138 EB

Good

Monmouth County, New Jersey · 1.5 MI East of Nj 18 JCT · Structure no. 1317159

Built
1974
51 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
310 ft
4 main spans
Daily traffic
4,998
2023 count
Owner
State
State Highway Agency

About this bridge

Nj 35 WB Ramp over Nj 35 & Nj 138 EB is a steel continuous stringer/multi-beam or girder carrying Nj 35 WB Ramp over Nj 35 & Nj 138 EB in Monmouth County, New Jersey. It was built in 1974, so it is 51 years old, younger than the New Jersey average of 58.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,998 vehicles a day, roughly 4% of them trucks, projected to reach 6,095 by 2043. The structure is 310 ft (94.5 m) long and 30 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesNj 35 WB Ramp
CrossesNj 35 & Nj 138 EB
Location1.5 MI East of Nj 18 JCT
RouteState Highway 35
Coordinates40.17412, -74.04251
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating73 US tons
Inventory rating47 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length310 ft (94.5 m)
Longest span80 ft (24.4 m)
Deck width30 ft (9.1 m)
Roadway width22 ft (6.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,998 (2023)
Projected traffic6,095 by 2043
Trucks4%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Nj 35 WB Ramp over Nj 35 & Nj 138 EB built?

It was built in 1974, making it 51 years old in 2025.

What condition is Nj 35 WB Ramp over Nj 35 & Nj 138 EB in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Nj 35 WB Ramp over Nj 35 & Nj 138 EB carry?

About 4,998 vehicles per day (2023 count), of which roughly 4% are trucks.

How long is Nj 35 WB Ramp over Nj 35 & Nj 138 EB?

The structure is 310 ft (94.5 m) long with a longest span of 80 ft (24.4 m) and a deck 30 ft wide.

Who owns Nj 35 WB Ramp over Nj 35 & Nj 138 EB?

It is owned by the State Highway Agency.