Njtpk Int 9 Rp Nt over Lawrence Brook
FairMiddlesex County, New Jersey · .1 MI N Interchange 9 · Structure no. M083530
- Built
- 1951
- 74 years old, rebuilt 1972
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 252 ft
- 3 main spans
- Daily traffic
- 22,562
- 2023 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
Njtpk Int 9 Rp Nt over Lawrence Brook is a steel stringer/multi-beam or girder carrying Njtpk Int 9 Rp Nt over Lawrence Brook in Middlesex County, New Jersey. It was built in 1951 and reconstructed in 1972, so it is 74 years old, older than the New Jersey average of 58.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 22,562 vehicles a day, roughly 7% of them trucks, projected to reach 40,014 by 2043. The structure is 252 ft (76.8 m) long and 76 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Njtpk Int 9 Rp Nt over Lawrence Brook built?
It was built in 1951, making it 74 years old in 2025. It was reconstructed in 1972.
What condition is Njtpk Int 9 Rp Nt over Lawrence Brook in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does Njtpk Int 9 Rp Nt over Lawrence Brook carry?
About 22,562 vehicles per day (2023 count), of which roughly 7% are trucks.
How long is Njtpk Int 9 Rp Nt over Lawrence Brook?
The structure is 252 ft (76.8 m) long with a longest span of 99 ft (30.2 m) and a deck 76 ft wide.
Who owns Njtpk Int 9 Rp Nt over Lawrence Brook?
It is owned by the State Toll Authority.