US Bridges

Nsi & Sni Rdwy over Tices Lane

Fair

Middlesex County, New Jersey · 1.5 MI S Int. 9 · Structure no. M081580

Built
1950
75 years old
Condition
Fair
inspected March 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
100 ft
3 main spans
Daily traffic
109,530
2023 count
Owner
Toll Authority
State Toll Authority

About this bridge

Nsi & Sni Rdwy over Tices Lane is a steel stringer/multi-beam or girder carrying Nsi & Sni Rdwy over Tices Lane in Middlesex County, New Jersey. It was built in 1950, so it is 75 years old, older than the New Jersey average of 58.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 109,530 vehicles a day, roughly 1% of them trucks, projected to reach 139,912 by 2043. The structure is 100 ft (30.5 m) long and 128 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesNsi & Sni Rdwy
CrossesTices Lane
Location1.5 MI S Int. 9
RouteInterstate 95
Coordinates40.45467, -74.42039
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60.4 US tons
Inventory rating46.4 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length100 ft (30.5 m)
Longest span38 ft (11.6 m)
Deck width128 ft (39 m)
Roadway width116 ft (35.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic109,530 (2023)
Projected traffic139,912 by 2043
Trucks1%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$450,000
NavigationNot applicable (no waterway)

Frequently asked questions

When was Nsi & Sni Rdwy over Tices Lane built?

It was built in 1950, making it 75 years old in 2025.

What condition is Nsi & Sni Rdwy over Tices Lane in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does Nsi & Sni Rdwy over Tices Lane carry?

About 109,530 vehicles per day (2023 count), of which roughly 1% are trucks.

How long is Nsi & Sni Rdwy over Tices Lane?

The structure is 100 ft (30.5 m) long with a longest span of 38 ft (11.6 m) and a deck 128 ft wide.

Who owns Nsi & Sni Rdwy over Tices Lane?

It is owned by the State Toll Authority.