US Bridges

Ramp Nisa over Njtpk (I-95)

Good

Middlesex County, New Jersey · Molly Pitcher Serv. Area · Structure no. M072290

Built
2014
11 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
321 ft
3 main spans
Daily traffic
6,300
2023 count
Owner
Toll Authority
State Toll Authority

About this bridge

Ramp Nisa over Njtpk (I-95) is a steel continuous stringer/multi-beam or girder carrying Ramp Nisa over Njtpk (I-95) in Middlesex County, New Jersey. It was built in 2014, so it is 11 years old, younger than the New Jersey average of 58.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,300 vehicles a day, roughly 1% of them trucks, projected to reach 7,600 by 2043. The structure is 321 ft (97.8 m) long and 32 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRamp Nisa
CrossesNjtpk (I-95)
LocationMolly Pitcher Serv. Area
RouteInterstate 95
Coordinates40.32989, -74.48319
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating49.6 US tons
Inventory rating38.3 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length321 ft (97.8 m)
Longest span120 ft (36.6 m)
Deck width32 ft (9.8 m)
Roadway width28 ft (8.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,300 (2023)
Projected traffic7,600 by 2043
Trucks1%
Lanes on structure1
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ramp Nisa over Njtpk (I-95) built?

It was built in 2014, making it 11 years old in 2025.

What condition is Ramp Nisa over Njtpk (I-95) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Ramp Nisa over Njtpk (I-95) carry?

About 6,300 vehicles per day (2023 count), of which roughly 1% are trucks.

How long is Ramp Nisa over Njtpk (I-95)?

The structure is 321 ft (97.8 m) long with a longest span of 120 ft (36.6 m) and a deck 32 ft wide.

Who owns Ramp Nisa over Njtpk (I-95)?

It is owned by the State Toll Authority.