Nj 35 over Perth Amboy CONN.(CR624)
GoodMiddlesex County, New Jersey · 0.28 Mi. N. of C.R. 656 · Structure no. 1223153
- Built
- 2024
- 1 years old
- Condition
- Good
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 209 ft
- 2 main spans
- Daily traffic
- 22,237
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Nj 35 over Perth Amboy CONN.(CR624) is a steel continuous stringer/multi-beam or girder carrying Nj 35 over Perth Amboy CONN.(CR624) in Middlesex County, New Jersey. It was built in 2024, so it is 1 years old, younger than the New Jersey average of 58.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 22,237 vehicles a day, roughly 4% of them trucks, projected to reach 27,133 by 2044. The structure is 209 ft (63.7 m) long and 74 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Nj 35 over Perth Amboy CONN.(CR624) built?
It was built in 2024, making it 1 years old in 2025.
What condition is Nj 35 over Perth Amboy CONN.(CR624) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does Nj 35 over Perth Amboy CONN.(CR624) carry?
About 22,237 vehicles per day (2024 count), of which roughly 4% are trucks.
How long is Nj 35 over Perth Amboy CONN.(CR624)?
The structure is 209 ft (63.7 m) long with a longest span of 114 ft (34.7 m) and a deck 74 ft wide.
Who owns Nj 35 over Perth Amboy CONN.(CR624)?
It is owned by the State Highway Agency.