Nj 35 (victory Br) over Raritan Rvr/Riverview DR
FairMiddlesex County, New Jersey · 0.48MI NE of RT9&35 JCT · Structure no. 1223150
- Built
- 2005
- 20 years old
- Condition
- Fair
- inspected June 2023
- Type
- Segmental Box Girder
- Prestressed Concrete Continuous
- Length
- 3,971 ft
- 23 main spans
- Daily traffic
- 25,462
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Nj 35 (victory Br) over Raritan Rvr/Riverview DR is a prestressed concrete continuous segmental box girder carrying Nj 35 (victory Br) over Raritan Rvr/Riverview DR in Middlesex County, New Jersey. It was built in 2005, so it is 20 years old, younger than the New Jersey average of 58.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 25,462 vehicles a day, roughly 4% of them trucks, projected to reach 31,068 by 2043. The structure is 3,971 ft (1,210.4 m) long and 86 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Nj 35 (victory Br) over Raritan Rvr/Riverview DR built?
It was built in 2005, making it 20 years old in 2025.
What condition is Nj 35 (victory Br) over Raritan Rvr/Riverview DR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does Nj 35 (victory Br) over Raritan Rvr/Riverview DR carry?
About 25,462 vehicles per day (2023 count), of which roughly 4% are trucks.
How long is Nj 35 (victory Br) over Raritan Rvr/Riverview DR?
The structure is 3,971 ft (1,210.4 m) long with a longest span of 440 ft (134.1 m) and a deck 86 ft wide.
Who owns Nj 35 (victory Br) over Raritan Rvr/Riverview DR?
It is owned by the State Highway Agency.